Contractor punch-list & inspection checklist

Contractor punch-lists live and die on shared understanding of what's done and what isn't. A photo-backed checklist walks that gap: the client and contractor look at the same finding, the same photo, and the same acceptance note. This checklist runs a pre-close punch walk in the format that actually gets projects finished and paid.

Who it's for

General contractors closing residential and light-commercial projects, subcontractors delivering scoped work, and clients running their own pre-close walks before final payment.

Key facts

  • Pre-close punch-list format
  • Photo proof per finding — both defect and completion
  • Reviewer sign-off for client acceptance
  • Packet suitable for final draw or lien waiver

The full checklist

  1. 1
    Site condition on arrival

    Overall site cleanliness, protection of finished areas, staging tidy.

  2. 2
    Exterior finishes

    Paint, caulking, trim, siding — any defects photographed with close-ups.

  3. 3
    Windows and doors

    Operate every window and door. Lockset function, weatherstripping, glass condition.

  4. 4
    Interior finishes — walls

    Paint touch-ups, drywall repairs, texture consistency.

  5. 5
    Interior finishes — floors

    Any scratches, gaps at baseboards, tile grout, transitions.

  6. 6
    Cabinetry and millwork

    Every cabinet door, drawer, and hinge. Toe kicks and end panels.

  7. 7
    Plumbing fixtures

    Every fixture operated. Leaks, drain speed, water pressure.

  8. 8
    Electrical fixtures

    Every switch and outlet tested. Fixtures level and secure.

  9. 9
    HVAC startup and commissioning

    System startup, register operation, thermostat function.

  10. 10
    Appliance install and function

    Every appliance installed, level, connected, and tested.

  11. 11
    Punch-list findings

    Every defect logged with wide + close-up photos and description.

  12. 12
    Contractor completion photos

    As each item is corrected, contractor photographs completion in the same step.

  13. 13
    Client sign-off

    Reviewer sign-off closes the checklist. Packet supports final draw.

Pro tips

Frequently asked

Who runs the punch walk?

Best practice: contractor walks first the day before, client walks with the contractor at the pre-close meeting. Both photograph and sign.

How does this help with final payment?

The signed PDF is the acceptance record most contracts and lenders require before releasing final funds.

What about warranty items?

Warranty items are logged separately after client acceptance. Start a new DoneTrace run per warranty visit.